Boysen Konstrukt Permaplast™ K-201 High-Performance Acrylic Skimcoat
Boysen Konstrukt Permaplast™ K-201 High-Performance Acrylic Skimcoat
Konstrukt Permaplast™ K-201 High-Performance Acrylic Skimcoat is a specially formulated bonding paste that is mixed with cement and applied on interior and exterior concrete substrates to correct surface imperfections prior to painting. It dries to a smooth cement finish and it repairs bubbles, honeycomb, and concrete defects such as waviness and plumbness from 2mm to 3mm thick.
FEATURES:
- Fixes wall imperfections from 2mm to 3 mm thick
- Minimizes the use of putty
- Minimizes cracking and improves water resistance
- Improves alkali resistance
- Imparts a smooth, luxurious look
PRINCIPAL USES: It is ideal for interior and exterior concrete surfaces.
DRY TIME: Recoat: 1 hour Cure: 7 days
THEORETICAL COVERAGE PER 4-LITERS: 10 sq. m. per 2mm coat
*Depending on surface texture and porosity
MIXING RATIO: Approximately 5-kg cement per 4-Liters of K-201 High Performance Acrylic Skimcoat
POT LIFE: 30 minutes to 1 hour
CLEAN-UP SOLVENT: Water
PACKAGING: 4-Liters and 16-Liters
APPLICATION: Trowel or putty knife
SERVICE CONDITION: Do not apply product on painted surface.
SURFACE PREPARATION:
- Surface should be clean and dry, free from oil, grease, dirt, contaminants, and all loose grit and mortar.
- Defects on concrete like plumbness that are more than 3mm thick should be addressed by using exterior renders.
- Always dampen the concrete before application. Plastered walls should already be cured for at least 14 - 28 days prior to the application of a skimcoat.
MATERIAL PREPARATION:
- Put K-201 High-Performance Acrylic Skimcoat in a suitable container and mix it with sifted cement at a 1:1 ratio by weight until a lump-free, homogenous paste is achieved. Do not add water.
- Use Portland cement (for ordinary cement color) or white cement (to produce a white finish).
APPLICATION SCHEDULE:
- Using a steel trowel, apply a thin layer of mixture on the surface by firmly pressing the edge of the trowel on the concrete until all areas are covered.
- Let it dry for at least 1 hour before applying the second coat.
- If trowel marks are visible, let surface dry for at least another hour before sanding to further smoothen surfaces. Allow at least 7 days before painting. No need to neutralize.